Project Name M-DCPS MASTER Nov. 2014
Project No. SPECIFICATION GUIDELINES 13745 − 2
H. The installer shall be prepared to offer a service contract for the maintenance of the
system after the warranty period. Produce evidence that they have a fully experienced
and established service organization for at least five (5) years and proven satisfactory
installations during that time.
1.2 RELATED SECTIONS:
A. Coordinate the work with the following M-DCPS Master Specifications sections:
1. 07840 - Firestopping and Smoke Sealing.
2. 13740 - Intercom and Clock Raceway Systems.
3. 13770 - Stage Sound System.
4. 13780 - Television Systems.
5. 13805 - Wireless Clock System.
6. 16100 - Basic Materials and Methods
7. 16112 - Raceways and Conduits.
8. 16131 - Outlet, Pull, and Junction Boxes.
9. 16160 - Terminal Cabinets.
10. 16450 - Grounding.
1.3 REFERENCES:
A. Comply with the latest copies of the following documents:
1. Florida Building Code (FBC).
2. National Electric Code (NEC).
3. Federal Communications Commission (FCC) - Part 68.
4. Underwriters Laboratory (UL) or other OSHA approved Nationally Recognized
Testing Laboratory (NRTL).
1.4 SUBMITTALS
A. Submit properly identified manufacturer's literature and technical data before starting
work.
B. Shop drawings shall include, but not be limited to, the following:
1. Three (3) sets. Include the manufacturer’s cut sheets and data sheets for all
components.
2. Wiring diagram prepared for the project indicating components and external wiring
and connections.
3. Use standard symbols for clocks, speakers, and call-in switches.
C. Quality Control Submittals:
1. Submit 5 copies of final test and system certification to A/E for distribution.
2. Provide certification from system manufacturer stating the installer has attended the
manufacturer's installation and service school. A certificate of this training shall be
provided with the intercom equipment contractor's submittal.
D. Closeout Submittals:
Kommentare zu diesen Handbüchern